Building components off-site before they ever reach the job is one of the biggest advantages we bring to a project. Our prefabrication shop assembles conduit runs, equipment racks, and other subassemblies under controlled conditions, then delivers them ready to install, so crews spend their time putting things together instead of building them from scratch in the field.
That approach pays off in both quality and schedule. Prefabricating in the shop means tighter tolerances, more consistent workmanship, and fewer surprises once material hits the site, all while compressing the timeline for tasks that would otherwise eat up hours of on-site labor. Work that’s staged ahead of time keeps crews moving instead of waiting on fabrication to catch up.
Backing all of it is the same 85,000 square feet of warehouse space at our Spindale, NC campus that supports our logistics operation, giving our prefabrication team the room to build, stage, and stay ahead of the schedule.